PMP項(xiàng)目管理試題:PMP樣題4
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
1、During the first half of the project. five team members left for other projects without being replaced. two team members went on vacation without informing you. and other team members expressed uncertainty about the work they were to complete. In this situation. it is BEST if you create a _____for the second half of the project.A. work breakdown structure
B. resource histogram
C. staffing management plan
D. responsibility matrix
1、在項(xiàng)目的前半段,有5個(gè)項(xiàng)目組成員離開到其它的項(xiàng)目去,而沒有資源來(lái)替代。2個(gè)項(xiàng)目組成員在沒有通知你的情況下去休假。其它的項(xiàng)目組成員對(duì)是否能夠完成自己的工作表示懷疑。在這種情況下,你為項(xiàng)目后半段創(chuàng)建______是最合適的?
A. WBS。
B. 資源柱狀圖。
C. 人員配備 管理 計(jì)劃。
D. 責(zé)任矩陣。
答案:C. 人員配備管理計(jì)劃。
分析:人員配備管理計(jì)劃描述了資源何時(shí)獲取和如何離開。
2、A project control system:
A. monitors and controls the project’s schedules, costs, scope, budgets, etc.
B. is a mechanism which reacts to the current project status in order to ensure accomplishment of project objectives
C. is only needed on large "mega" projects
D. is a system for controlling and executing project documentation in a uniform and timely manner
2、一個(gè)項(xiàng)目控制系統(tǒng):
A. 監(jiān)督和控制項(xiàng)目的進(jìn)度、成本、范圍、預(yù)算等等
B. 是為了確保項(xiàng)目目標(biāo)的實(shí)現(xiàn)而反映當(dāng)前項(xiàng)目狀態(tài)的一種機(jī)制
C. 僅僅在大項(xiàng)目中需要
D. 是以一個(gè)統(tǒng)一和及時(shí)的方法來(lái)控制和執(zhí)行項(xiàng)目文檔的系統(tǒng)
答案:A. 監(jiān)督和控制項(xiàng)目的進(jìn)度、成本、范圍、預(yù)算等等
分析: 一個(gè)控制項(xiàng)目的時(shí)間和成本的系統(tǒng),以及項(xiàng)目將怎樣被控制的政策和程序,不管項(xiàng)目大小,都要這樣做。
3、An activity has an early start date-of the 10th and a late start date of the 19th. The activity also has a duration of 4 days. There are no nonworkdays. From the information given, what can be concluded about the activity?
A. Total float for the activity is 9 days.
B. The early finish date of the activity is the end of the day on the 14th.
C. The late finish date is the 25th.
D. The activity can be completed in 2 days if the resources devoted to it are doubled
3、一項(xiàng)工作最早開始日期為10號(hào),最晚開始日期為19號(hào),該項(xiàng)工作周期為4天,這其中沒有休息日。從以上給出的信息,關(guān)于該項(xiàng)工作可以得出什么結(jié)論?
A. 該項(xiàng)工作的總浮動(dòng)日期為9天
B. 該項(xiàng)工作最早完成日期為14號(hào)當(dāng)天結(jié)束時(shí)
C. 該項(xiàng)工作最遲完成的日期為25號(hào)
D. 如果投入該項(xiàng)工作的資源增加一倍的話,該項(xiàng)工作可以在兩天內(nèi)完成
答案:A. 該項(xiàng)工作總浮動(dòng)日期為9天
分析:計(jì)算總的浮動(dòng)時(shí)間的公式是用活動(dòng)完成最遲的時(shí)間減去最早的時(shí)間,即19-10=9
4、You are working on the cost budget for one project. Which of the following is true?
A. This process assigns cost estimates to project activities including risks and contingency plans.
B. The cost baseline will be used to measure variances and future project performance.
C. This process assigns cost estimates for expected future period operating costs. D. The cost baseline is the expected cost for the project.
4、你正在為一個(gè)項(xiàng)目進(jìn)行成本預(yù)算,以下哪項(xiàng)是正確的?
A. 這個(gè)過程分配成本預(yù)算給包括風(fēng)險(xiǎn)和應(yīng)急計(jì)劃在內(nèi)的項(xiàng)目活動(dòng)
B. 成本基線用于評(píng)估偏差和將來(lái)的項(xiàng)目績(jī)效
C. 這個(gè)過程分配成本預(yù)算給將來(lái)的周期運(yùn)行成本
D. 成本基線是項(xiàng)目成本的期望值
答案:B. 成本基線用于評(píng)估偏差和將來(lái)的項(xiàng)目績(jī)效
分析:將來(lái)的周期運(yùn)行成本被認(rèn)為是運(yùn)行成本,不是項(xiàng)目成本的一部分
5、The project team should have a working knowledge of statistical process control to help conduct quality control activities. Of all the topics involved, which of the following is the most important for the team to understand?
A. Sampling and probability
B. Attribute sampling and variable sampling
C. Tolerances and control limits
D. Special causes and random causes
5、項(xiàng)目團(tuán)隊(duì)?wèi)?yīng)該了解如何利用統(tǒng)計(jì)知識(shí)進(jìn)行質(zhì)量控制。在下面所有涉及的議題中,哪一個(gè)是項(xiàng)目團(tuán)隊(duì)最需要知道的?
A. 取樣和概率
B. 屬性取樣和變量取樣
C. 公差和控制限度
D. 特別原因和隨機(jī)原因
答案:A. 取樣和概率
分析:來(lái)自于統(tǒng)計(jì)過程控制的取樣和概率幫助團(tuán)隊(duì)調(diào)整項(xiàng)目結(jié)果以符合相關(guān)質(zhì)量標(biāo)準(zhǔn),這樣可以確定用來(lái)減少產(chǎn)生令人不滿的結(jié)果的原因
- 12015安全工程師《生產(chǎn)技術(shù)》: 煙花爆竹行業(yè)生產(chǎn)安全
- 22015年二級(jí)建造師《市政》:溝槽支撐與拆除
- 3造價(jià)工程師復(fù)習(xí)資料:可行性研究報(bào)告的編制程序
- 4工程項(xiàng)目組織與管理知識(shí)點(diǎn):工程項(xiàng)目范圍管理范圍界定目的
- 52015年注冊(cè)咨詢工程師《工程咨詢概論》模擬題(22)
- 6咨詢方法與實(shí)務(wù)考點(diǎn):設(shè)備運(yùn)雜費(fèi)
- 7某大橋基礎(chǔ)處理實(shí)例
- 8地下結(jié)構(gòu)防水工程施工工藝標(biāo)準(zhǔn)(2004年)
- 92015年咨詢工程師每日一練免費(fèi)在線測(cè)試(2015.1.12)
- 102008年安全工程師考試《安全生產(chǎn)管理知識(shí)》習(xí)題十八
- 112015一級(jí)建造師考試知識(shí)點(diǎn)精髓《建筑專業(yè)》(2)
- 12大樹移植土球打包圖示
- 132015一級(jí)建造師《鐵路工程》復(fù)習(xí)指南(16)
- 142015年一級(jí)建造師考試輔導(dǎo):項(xiàng)目管理規(guī)范(十六)
- 15預(yù)制后張法預(yù)應(yīng)力混凝土橋梁施工工法
- 16招標(biāo)師法律法規(guī):工程建設(shè)項(xiàng)目招標(biāo)范圍和規(guī)模標(biāo)準(zhǔn)規(guī)定
- 17景觀綠化工程施工組織設(shè)計(jì)96p
- 18招標(biāo)師歷年考試真題的意義
- 192015年安全工程師《生產(chǎn)技術(shù)》:檢修中的安全注意事項(xiàng)
- 20安全工程師考點(diǎn)精華:爆破作業(yè)的安全管理規(guī)定
- 21二級(jí)建造師法規(guī)知識(shí)點(diǎn):終止勞動(dòng)合同的經(jīng)濟(jì)補(bǔ)償
- 22建筑工程地下室防水施工技術(shù)探討
- 23菏澤市2015年安全工程師考試報(bào)名時(shí)間為6月1日至15日
- 242012一級(jí)建造師《公路工程》:價(jià)差考核的目的和對(duì)象
- 25中鐵建大橋工程局金溫鐵路項(xiàng)目施工連獲突破
- 26現(xiàn)代咨詢方法與實(shí)務(wù)知識(shí)點(diǎn):財(cái)務(wù)生存能力分析
- 27建筑工程深基坑施工過程中的常見問題
- 28四川省雅安經(jīng)石棉瀘沽高速公路某隧道工程某合同段施工組織設(shè)計(jì)
- 292015年河南安全工程師報(bào)名時(shí)間
- 30保定某高層住宅項(xiàng)目施工現(xiàn)場(chǎng)平面布置圖
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓