監(jiān)理公司管理系統(tǒng) | 工程企業(yè)管理系統(tǒng) | OA系統(tǒng) | ERP系統(tǒng) | 造價咨詢管理系統(tǒng) | 工程設計管理系統(tǒng) | 甲方項目管理系統(tǒng) | 簽約案例 | 客戶案例 | 在線試用
X 關閉
軟件項目管理工具

當前位置:工程項目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項目管理工具

礪志PMP模擬題本周精選13

申請免費試用、咨詢電話:400-8352-114

Qustions 1:
You are in charge of developing a new product for a bank. Your quality metrics are based on the 80th percentile of each of the last three products developed. This is an example of:

a.Statistical sampling
b. Metrics
c. Benchmarking
d. Operational definitions

Qustions 3:

Scoring models, comparative approaches and benefit contribution are all part of:

a. Constrained optimization models for selecting a project
b. Benefit measurement models for selecting a project
c. Quality measurement techniques
d. Information distribution tools

Qustions 5:

Which of the following models of conflict resolution allows a cooling off period, but seldom resolves the issue in the long term?

a.Problem solving
b. Withdrawal
c. Forcing
d. Smoothing

Qustions 2:
The two closing procedures are called:

a. Contract close out and scope verification
b. Contract close out and administrative closure
c. Project closure and product verification
d. Project closure and lessons learned

Qustions 4:

During the schedule development process the Project Manager may have to go through several iterations of the schedule before establishing the schedule baseline. All of the following are tools and techniques that may be used during this process:

a. Critical Path Method, GERT, Resource Requirements
b. Resource Leveling Heuristics, Mathematical Analysis, Calendars
c. Duration compression, Resource Leveling Heuristics, PERT
d. GERT, PERT, Leads and Lags

Qustions 6:

The “To Complete Performance Index” (TCPI) is calculated by:

a.Subtracting the actual costs to date from the estimate at completion
b.Dividing the budgeted cost of the remaining work by the difference between the estimate at completion and actual costs to date
c.Multiplying the estimate at completion by the cumulative cost performance index
d.Adding the estimate at completion to the actual costs to date and multiplying by the cumulative cost performance index
發(fā)布:2007-03-02 10:57    編輯:泛普軟件 · xiaona    [打印此頁]    [關閉]
相關文章:

泛普軟件項目管理工具其他應用

項目管理工具 禪道項目管理軟件 夢龍項目管理軟件 微軟項目管理軟件 裝飾管理系統(tǒng) 裝修預算軟件 項目計劃軟件 項目進度管理軟件 軟件項目管理工具 材料管理軟件 工程項目管理軟件系統(tǒng) 項目管理系統(tǒng) 施工管理軟件 建筑工程項目管理軟件 工程管理軟件