A change control system should include all the following except-
a.Procedures for automatic approval of defined categories of change
b. Paperwork, tracking systems, and approval levels necessary for authorizing changes
c. A description of the powers and responsibilities of the change control board
d. Procedures for conducting a midproject control system review
Qustions 3:
Two fundamental objectives of project control are to--
a. Alter activities to achieve results and manage organizational assets
b. Eliminate unexpected technical problems and identify technical difficulties that require more resources
c. Ensure that resources are available when needed and avoid increases in the scope of work
d. Have the required material, personnel, and equipment available when needed and ensure that budgeting is adequate
Qustions 5:
The project plan is important in change control because it--
a.Provides the baseline against which changes are managed
b. Provides the information on project performance
c. Alerts the project team to issues that may cause problems in the future
d. Is expected to change throughout the project
Qustions 2:
Written changes orders should be required on --
a. All projects, large and small
b. Large projects
c. Projects with a formal configuration management system in place
d. Projects for which the cost of a change control system can be justified
Qustions 4:
The principal sources of project failure are-
a. Lack of a projectized or strong matrix structure, poor scope definition, and lack of a project plan
b. Lack of commitment or support by top management, disharmony on the project team, and lack of leadership by the project manager
c. Poorly identified customer needs, a geographically dispersed project team, and little communication with the customer until the project is delivered
d. Organizational factors, poorly identified customer needs, inadequately specified project requirements, and poor planning and control
Qustions 6:
Interface management is --
a.Considered to be one of the easier aspects of implementing the project plan
b.Primarily concerned with the technical issues associated with linking system components in a configuration
c.Facilitated by use of the WBS to display the ways people on the project interact and their duties and responsibilities
d.The process of coordinating the various elements of the project so that they meet their joint goals of performance, schedule, and budget
- 1某道路改造及管線鋪設(shè)工程施工組織設(shè)計(jì)
- 2地震專家:水庫蓄水與大地震無必然聯(lián)系
- 32015年監(jiān)理工程師《建設(shè)工程合同管理》練習(xí)題(95)
- 42015年注冊安全工程師考試《管理知識》:預(yù)警評價(jià)指標(biāo)
- 5黃土地基上的路堤填筑要求
- 62015年造價(jià)員基礎(chǔ)知識:工程造價(jià)信息的管理
- 7預(yù)算拮據(jù)之裝修房子的10個(gè)重要點(diǎn)
- 82015年二級建造師《施工管理》每日一練匯總
- 92012一級建造師《公路工程》正版考試用書增值服務(wù)第三次
- 102015年安全工程師相關(guān)法規(guī)模擬練習(xí)(12)
- 11江蘇堅(jiān)持在村莊環(huán)境整治中反對形式主義 落實(shí)長效機(jī)制
- 12造價(jià)工程師建設(shè)工程造價(jià)管理復(fù)習(xí)資料——設(shè)備租賃與購置分析
- 132015年二級建造師《市政》:預(yù)算、計(jì)劃、統(tǒng)計(jì)、合同人員的管理責(zé)任內(nèi)容
- 142015年深圳造價(jià)工程師考試用書預(yù)訂注意事項(xiàng)公告
- 15機(jī)場建設(shè)費(fèi)飽受爭議變身民航發(fā)展基金 一年29億支出無明細(xì)
- 16安全工程師考試《法律法規(guī)》習(xí)題班講義精選(30)
- 172015年監(jiān)理工程師《建設(shè)工程三大控制》練習(xí)題(54)
- 182015造價(jià)員《土建工程》知識點(diǎn):浮籠
- 192015年招標(biāo)師《項(xiàng)目管理與招標(biāo)采購》講義(3)
- 20建設(shè)項(xiàng)目董事會的職權(quán)包括哪些
- 212015年咨詢工程師《組織與管理》模擬題(3)
- 22建筑深基坑工程主要特點(diǎn)有哪些
- 232015年注冊咨詢工程師《工程咨詢概論》模擬題(37)
- 24淺談土工膜在混凝土壩缺陷修補(bǔ)中的應(yīng)用
- 25公園道路園林綠化施工組織設(shè)計(jì)
- 262015招標(biāo)師職業(yè)水平考試考點(diǎn):行政法律責(zé)任
- 27監(jiān)理工程師考試2015年《建設(shè)工程合同管理》練習(xí)題(7)
- 28攪拌車發(fā)動(dòng)機(jī)保養(yǎng)小知識
- 292015年咨詢工程師《工程咨詢概論》每日一練7.9
- 302015年咨詢工程師每日一練免費(fèi)在線測試(2015.11.14)
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓