Qustions 1:Which statement about customer expectations is not true --
a. The product or service should be usable as intended.
b. Contractual provisions, including schedule and performance standards, should be met.
c. Changes should be made immediately, and all customer wants should be satisfied without bureaucratic hassle
d. The seller should assume the responsibility of understanding customer needs and addressing them effectively.
Qustions 3:
The document that describes the objectives, work content, deliverables, and end product of a project is the--
a. Project charter
b. Product description
c. Scope statement
d. WBS
Qustions 5:
Maintenance is crucially important to projects and should--
a.Be included as an activity to be performed during the closeout phase
b. Have a separate phase in the life cycle in information systems projects because 60% to 70% of life-cycle costs of computer systems are generally devoted to maintenance
c. Not be viewed as part of the project life cycle
d. Always be viewed as a separate project
Qustions 2:
The WBS is an input to scope change control because it--
a. Provides information on project objectives
b. Defines the project’s scope baseline
c. Defines all project baselines
d. Provides information on scope performance
Qustions 4:
When an organization chooses a project selection model, the most important criterion is --
a. Capability
b. Realism
c. Ease of use
d. Cost
Qustions 6:
A project manager’s company operates in a high-technology area requiring the integration and sharing of several functional specialties. The project manager is considering the appropriate organizational structure ofr a new project, the likely choice would be --
a.Matrix
b.Tight matrix
c.Functional
d.Projectized
- 12012一級(jí)建造師《公路工程》:路面粒料基層施工技術(shù)
- 2連拱隧道實(shí)施性施工組織設(shè)計(jì)109頁(yè)(新奧法)
- 3某特大橋高墩翻模安全專(zhuān)項(xiàng)施工方案
- 42015年咨詢(xún)工程師《項(xiàng)目決策分析與評(píng)價(jià)》每日一練4.16
- 52015招標(biāo)師考試案例分析
- 62015一級(jí)建造師《市政工程》講義摘要(12)
- 7一級(jí)建造師《工程經(jīng)濟(jì)》知識(shí)點(diǎn)整理(9)
- 82013年二級(jí)建造師《建筑》:鋼筋工程
- 92015年造價(jià)員基礎(chǔ)知識(shí):對(duì)高強(qiáng)混凝土組成材料的要求
- 10淺談土工膜在混凝土壩缺陷修補(bǔ)中的應(yīng)用
- 11編制投標(biāo)書(shū)常見(jiàn)的115個(gè)錯(cuò)誤(十一)
- 12四川省2008年度注冊(cè)安全工程師執(zhí)業(yè)資格考試報(bào)名時(shí)間延長(zhǎng)至7月2日
- 132015年造價(jià)員基礎(chǔ)知識(shí)重點(diǎn)輔導(dǎo):招標(biāo)投標(biāo)
- 142015造價(jià)員《安裝工程》知識(shí):各工程量清單項(xiàng)目
- 152015招標(biāo)師《法律法規(guī)與政策》:訴訟時(shí)效
- 162015安全工程師《生產(chǎn)管理》模擬題(20)
- 17吐庫(kù)二線(xiàn)首個(gè)電氣化“心臟”激活 南疆鐵路將進(jìn)入電氣化時(shí)代
- 18京包鐵路集寧至包頭段增建某隧道工程(實(shí)施)施工組織設(shè)計(jì)
- 19國(guó)家重點(diǎn)工程滬昆客專(zhuān)江西弋陽(yáng)特大橋開(kāi)始架梁
- 202015年造價(jià)工程師考試學(xué)習(xí)計(jì)劃表
- 212015年招標(biāo)師考試招標(biāo)采購(gòu)法律法規(guī)與政策輔導(dǎo)講義四
- 222015年安全工程師《事故案例分析》試題(8)
- 232015年招標(biāo)師《招標(biāo)采購(gòu)案例分析》:工程實(shí)施事件
- 24礦井雨季防治水技術(shù)篇(一)
- 25一級(jí)建造師考試精華總結(jié):代理的種類(lèi)
- 262015年安全工程師安全生產(chǎn)技術(shù)練習(xí)題(8)
- 27二級(jí)建造師《法規(guī)》考點(diǎn)狂背:建設(shè)工程施工許可制度
- 28泰國(guó)將籌建兩條高鐵 穿過(guò)老撾與中國(guó)西南部聯(lián)通
- 29造價(jià)工程師復(fù)習(xí)資料:線(xiàn)性盈虧平衡分析的前提條件
- 30現(xiàn)場(chǎng)臨時(shí)用水用電布置圖
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓