2010年P(guān)MP美國項(xiàng)目管理考試習(xí)題及答案二十五

申請免費(fèi)試用、咨詢電話:400-8352-114

QUEST A(n) _____ is defined as a specified accomplishment  in a particular instant in time which does not consume time or resources. 
A Activity 
B Event. 
C Correlation 
D Constant 
E Event constrained within planned effort. 
參考答案:B

QUEST Which of the following impacts the critical path? 
A Changing the task duration. 
B Reduce the free float of an activity. 
C Executing a backward pass 
D A or B 
E None of the above. 
參考答案:A

QUEST The range of time allowed for an activity to be completed in is the _____. 
A Planned time (Duration). 
B Float time (LS - ES, or LF - EF). 
C Critical time (when ES = LS, or EF = LF). 
D Scheduled time (LF - ES). 
E Event. 
參考答案:D

QUEST Free float is the amount of time that an activity may be delayed with out affecting the _____. 
A Early start of the succeeding activities. 
B Late start of the succeeding activities. 
C Project finish. 
D Cost of the project. 
E None of the above. 
參考答案:A

QUEST Using the problem stated in the Special window, Calculate the deviation of duration for the task, using the PERT concept of standard deviation of task duration. 
A 0.5 
B 1 
C 1.8 
D 2.2 
E 2.8 
參考答案:C

相關(guān)試題:

2010年P(guān)MP美國項(xiàng)目管理考試習(xí)題及答案二十四

試題推薦:

2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選1

2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選2

2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選3

發(fā)布:2007-03-02 10:54    編輯:泛普軟件 · xiaona    [打印此頁]    [關(guān)閉]
相關(guān)文章:

泛普軟件項(xiàng)目管理工具其他應(yīng)用

項(xiàng)目管理工具 禪道項(xiàng)目管理軟件 夢龍項(xiàng)目管理軟件 微軟項(xiàng)目管理軟件 裝飾管理系統(tǒng) 裝修預(yù)算軟件 項(xiàng)目計劃軟件 項(xiàng)目進(jìn)度管理軟件 軟件項(xiàng)目管理工具 材料管理軟件 工程項(xiàng)目管理軟件系統(tǒng) 項(xiàng)目管理系統(tǒng) 施工管理軟件 建筑工程項(xiàng)目管理軟件 工程管理軟件