QUEST Excessive flexibility in specifying requirements will _____ the likelihood of time overruns. 
A Reduce. 
B Eliminate. 
C Double 
D Increase 
E Not affect 
參考答案:D

QUEST The key purpose of project control is to: 
A Plan ahead for uncertainties. 
B Generate status reports. 
C Keep the project on track. 
D Develop the project road map. 
E All of the above. 
參考答案:C

QUEST Fast tracking means to: 
A Speed up a project through parallel tasks. 
B Swap one task for another. 
C Reduce the number of tasks if possible. 
D B and C. 
E None of the above. 
參考答案:A

QUEST As a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is: 
A Insignificant. 
B Reduced. 
C Unchanged. 
D Increased. 
E Doubled. 
參考答案:C

QUEST The purpose of a dummy activity in an activity-on-arrow diagram is to: 
A Identify a task that could be replaced by another. 
B Take the slack time into account. 
C Show a task that is not necessarily needed. 
D Denote a milestone. 
E Show a dependency relationship. 
參考答案:E

相關(guān)試題:

2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案二十六

試題推薦:

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選1

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選2

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選3

發(fā)布:2007-03-02 10:54    編輯:泛普軟件 · xiaona    [打印此頁(yè)]    [關(guān)閉]
相關(guān)文章:

泛普軟件項(xiàng)目管理工具其他應(yīng)用

項(xiàng)目管理工具 禪道項(xiàng)目管理軟件 夢(mèng)龍項(xiàng)目管理軟件 微軟項(xiàng)目管理軟件 裝飾管理系統(tǒng) 裝修預(yù)算軟件 項(xiàng)目計(jì)劃軟件 項(xiàng)目進(jìn)度管理軟件 軟件項(xiàng)目管理工具 材料管理軟件 工程項(xiàng)目管理軟件系統(tǒng) 項(xiàng)目管理系統(tǒng) 施工管理軟件 建筑工程項(xiàng)目管理軟件 工程管理軟件