2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案四十七

申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114

QUEST Which of the following is considered a direct cost for producing a widget? 
A The cost of the materials used to produce a widget. 
B The labor costs of the workers who actually produced the widget. 
C The rent for the building in which the widget was manufactured 
D The salary of senior management and the project sponsor 
E A and B only 
參考答案:E

QUEST The reason that cost management is so difficult in project management is that: 
A Projects by definition and nature are non-recurring events and are therefore difficult to predict. 
B There are no tools for identifying project tasks. 
C Project managers do not care about tracking costs, as only schedules are important to all project managers. 
D A and B only 
E B and C only 
參考答案:A

QUEST Upon completion of 75% of the project, the original schedules and cost estimates that were submitted at the inception of the project are referred to as the: 
A Baseline costs 
B Budgeted costs. 
C Estimates upon completion costs 
D Scheduled costs 
E None of the above 
參考答案:A

QUEST The difference between the BCWS and the BCWP is referred to as the: 
A Schedule variance 
B Cost variance. 
C Estimate of completion 
D Actual cost of the work performed 
E None of the above 
參考答案:A

QUEST When a project manager is running over the budgeted costs, the project manager can typically _____ to attempt to get the project back on budget. 
A Reduce features and/or functionality 
B Increase risk. 
C Incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times) 
D All of the above. 
E A and B only 
參考答案:D

相關(guān)試題:

2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案四十六

試題推薦:

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選1

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選2

2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選3

發(fā)布:2007-03-02 10:54    編輯:泛普軟件 · xiaona    [打印此頁(yè)]    [關(guān)閉]
相關(guān)文章:

泛普軟件項(xiàng)目管理工具其他應(yīng)用

項(xiàng)目管理工具 禪道項(xiàng)目管理軟件 夢(mèng)龍項(xiàng)目管理軟件 微軟項(xiàng)目管理軟件 裝飾管理系統(tǒng) 裝修預(yù)算軟件 項(xiàng)目計(jì)劃軟件 項(xiàng)目進(jìn)度管理軟件 軟件項(xiàng)目管理工具 材料管理軟件 工程項(xiàng)目管理軟件系統(tǒng) 項(xiàng)目管理系統(tǒng) 施工管理軟件 建筑工程項(xiàng)目管理軟件 工程管理軟件