QUEST Which of the following is considered a direct cost for producing a widget?
A The cost of the materials used to produce a widget.
B The labor costs of the workers who actually produced the widget.
C The rent for the building in which the widget was manufactured
D The salary of senior management and the project sponsor
E A and B only
參考答案:E
QUEST The reason that cost management is so difficult in project management is that:
A Projects by definition and nature are non-recurring events and are therefore difficult to predict.
B There are no tools for identifying project tasks.
C Project managers do not care about tracking costs, as only schedules are important to all project managers.
D A and B only
E B and C only
參考答案:A
QUEST Upon completion of 75% of the project, the original schedules and cost estimates that were submitted at the inception of the project are referred to as the:
A Baseline costs
B Budgeted costs.
C Estimates upon completion costs
D Scheduled costs
E None of the above
參考答案:A
QUEST The difference between the BCWS and the BCWP is referred to as the:
A Schedule variance
B Cost variance.
C Estimate of completion
D Actual cost of the work performed
E None of the above
參考答案:A
QUEST When a project manager is running over the budgeted costs, the project manager can typically _____ to attempt to get the project back on budget.
A Reduce features and/or functionality
B Increase risk.
C Incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times)
D All of the above.
E A and B only
參考答案:D
2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案四十六
試題推薦:
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選1
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選2
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選3
- 12015年咨詢工程師《工程項(xiàng)目組織與管理》每日一練4.28
- 22015年招標(biāo)師《專業(yè)實(shí)務(wù)》:制作投標(biāo)文件應(yīng)注意的問(wèn)題
- 3二級(jí)建造師法規(guī)知識(shí)點(diǎn):合同的履行
- 4增強(qiáng)水泥(GRC)聚苯復(fù)合板施工工藝
- 5安全工程師生產(chǎn)管理復(fù)習(xí)要點(diǎn):粉塵與氣溶膠的區(qū)別
- 61#-8#樓模板施工方案10p
- 7既是監(jiān)理工程師權(quán)利又是監(jiān)理工程師義務(wù)的有哪個(gè)
- 82015年二級(jí)建造師《法規(guī)及相關(guān)知識(shí)》每日一練(8.9)
- 9安全工程師考試《安全生產(chǎn)管理》第三講講義精選(5)
- 102015年監(jiān)理工程師《建設(shè)工程三大控制》練習(xí)題(95)
- 11名師達(dá)江解答二級(jí)建造師相關(guān)疑問(wèn)——學(xué)習(xí)篇(三)
- 12【招標(biāo)師考試】項(xiàng)目管理與招標(biāo)采購(gòu)第三章:匯付
- 132015年咨詢工程師《宏觀經(jīng)濟(jì)政策》練習(xí)習(xí)題(11)
- 142015年咨詢工程師考試《項(xiàng)目決策分析與評(píng)價(jià)》模擬試題(九)
- 152015造價(jià)員《土建工程》知識(shí)點(diǎn):乳液涂料
- 162015咨詢工程師考試《現(xiàn)代咨詢方法與實(shí)務(wù)》考前沖刺(1)
- 172015年監(jiān)理工程師考試質(zhì)量、投資、進(jìn)度控制練習(xí)題(35)
- 182015年白山造價(jià)工程師考試用書(shū)
- 19土工合成材料復(fù)合地基施工工藝標(biāo)準(zhǔn)
- 20安全工程師考試《法律法規(guī)》習(xí)題班講義精選(18)
- 212013年河北二級(jí)建造師初始注冊(cè)申請(qǐng)表
- 222015年造價(jià)工程師考試輔導(dǎo):合同的終止(2)
- 232015年天津安全工程師報(bào)名條件
- 242015年安全工程師防火防爆安全生產(chǎn)技術(shù)習(xí)題(2)
- 25平板機(jī)安全要求
- 26阜六鐵路全線鋪通
- 272015年監(jiān)理工程師考試合同管理練習(xí)題(19)
- 28中建八局引領(lǐng)綠色建筑工業(yè)轉(zhuǎn)型 推進(jìn)裝配式建筑
- 292015咨詢工程師考試《咨詢概論》預(yù)測(cè)試題(2)
- 302015年咨詢工程師《工程咨詢概論》考試模擬題(8)
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓