監(jiān)理公司管理系統(tǒng) | 工程企業(yè)管理系統(tǒng) | OA系統(tǒng) | ERP系統(tǒng) | 造價(jià)咨詢(xún)管理系統(tǒng) | 工程設(shè)計(jì)管理系統(tǒng) | 甲方項(xiàng)目管理系統(tǒng) | 簽約案例 | 客戶(hù)案例 | 在線(xiàn)試用
X 關(guān)閉
軟件項(xiàng)目管理工具

當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具

PMP認(rèn)證考試練習(xí)題及參考答案(五十四)

申請(qǐng)免費(fèi)試用、咨詢(xún)電話(huà):400-8352-114

1 Which of the following control types has the highest risk to the owner:
A Firm fixed price (FFP)
B Time and material (T&M)
C Cost plus fixed fee (CPFF)
D Cost plus incentive fee (CPIF)
E A and B only
B
2 Which of the following contract types has the highest risk to the contractor:
A Firm fixed price (FFP)
B Time and material (T&M)
C Cost plus fixed fee (CPFF) 來(lái)源:考
D Cost plus incentive fee (CPIF)
E A and B only
A
3 Arbitration is a _____ approach to conflict management in resolving conflict disputes.
A lose-lose
B win-win
C win-lose
D lose-win
E closed door
A
4 Which of the following is not a method of government procurement.
A Assistance
B sealed bidding
C competitive proposals
D acquisition
E small purchases
D
5 The review for the specification completeness is performed during which of the following cycles.
A Award cycles
B requirements cycle
C requisition cycle
D solicitation cycle
E contractual cycle
C
6 In which of the following is the cost of risk hidden by the contractor?
A Firm Fixed Price Contract
B Fixed Price Plus Incentive
C Cost Plus Fixed Price
D Cost Plus Percentage of Cost
E A and B
D
7 The definitive terms of a contract are written during which of the following contract phases?
A Contract Phase
B Post-Award Phase
C Award Phase
D Pre-Award Phase
E Requirement Phase
C
8 The _____ specification delineates specific end use capabilities which can be tested in the acceptance procedure.
A performance
B functional
C technical
D base line http://ks.examda.com
E operational
B
9 Which one of the following is not an acquisition method?
A advertising
B invitation
C negotiation
D purchase
E all are acquisition methods
A
10 Which is not a negotiation tactic?
A Imposing deadlines
B surprises
C person with authority is absent
D reasoning together
E all are negotiations tactics
E
11 A warranty may not be a remedy for products delivered unfit when _____ .
A the PM has knowledge of the product, inspected it without relying on the seller's skill
B the products delivered comply with the plans and specifications of the client
C the plans and specifications produced by the seller match the completed product.
D A and B
E None of the above.
D
12 The Statement of Work (SOW) is developed during the _____ cycle.
A Award
B Solicitations
C requirements
D contractual
E requisitions
C
發(fā)布:2007-03-02 10:49    編輯:泛普軟件 · xiaona    [打印此頁(yè)]    [關(guān)閉]
相關(guān)文章:

泛普軟件項(xiàng)目管理工具其他應(yīng)用

項(xiàng)目管理工具 禪道項(xiàng)目管理軟件 夢(mèng)龍項(xiàng)目管理軟件 微軟項(xiàng)目管理軟件 裝飾管理系統(tǒng) 裝修預(yù)算軟件 項(xiàng)目計(jì)劃軟件 項(xiàng)目進(jìn)度管理軟件 軟件項(xiàng)目管理工具 材料管理軟件 工程項(xiàng)目管理軟件系統(tǒng) 項(xiàng)目管理系統(tǒng) 施工管理軟件 建筑工程項(xiàng)目管理軟件 工程管理軟件