PMP認(rèn)證考試練習(xí)題及參考答案(十八)
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
1. which of the following fall(s) under the responsibilities of a project manager?
a. labor relations with project personnel
b. affirmative action
c. personnel training
d. discrimination and equal employment opportunity
e. all of the above
ans: e
2. a legally binding document offered unilaterally is a _____ .
a. purchase order
b. scope of work description
c. contract stipulation
d. level of effort proposal
e. request for proposal考試大論壇
ans: a
3. a technical requirement has which of the following characteristics:
a. easy to understand
b. a communication tool between the user and the design team
c. written in non-technical language
d. developed in cooperation with the user
e. typically describe physical dimensions and performance requirements
ans: e
4. if a project manager communicates a verbal message to a subordinate, and the subordinate leaves without saying a word, the project
manager should assume:
a. the message was understood
b. the message was not understood
c. the subordinate discarded the information
d. the information was not appropriate
e. none of the above.
ans: e
5. inspection of a complex project according to specifications is accomplished by _____.
a. inspection by attributes.
b. cyclical inspection
c. quality conformance inspection
d. original inspection來源:考試大網(wǎng)
e. none of the above.
ans: c
6. the behavioral responsibilities of a project manager may also include dealing with:
a. the public
b. regulatory personnel
c. the legal environment
d. environmental issues
e. all of the above
ans: e
7. the difference between the bcws and the bcwp is referred to as the:
a. schedule variance
b. cost variance.
c. estimate of completion
d. actual cost of the work performed
e. none of the above
ans: a
8. "paraphrasing" is most closely associated with which part of the communication process?
a. encoding
b. decoding
c. barriers
d. feedback
e. none of the above.
ans: d
9. a gantt chart is useful in determining:
a. the level of effort for a task
b. when a task starts and stops
c. how tasks are related to each other
d. who is assigned to do a task來源:考試大
e. all of the above.
ans: b
10. a contract originated bilaterally may be developed by _____ .
a. quotation request from suppliers
b. proposal request
c. bid invitation release
d. b and c
e. all of the above.
ans: e
11. in a matrix organizational form, which factor(s) make it difficult for a project manager to provide a valid input into the employee's performance
review?
a. not working directly with the assigned functional employees
b. employees spend only a short amount of time assigned to the project
c. not being knowledgeable enough to evaluate employees on technical judgment
d. all of the above
e. a and b only
ans: d來源:www.examda.com
12. upon completion of 75% of the project, the original schedules and cost estimates that were submitted at the inception of the project are
referred to as the:
a. baseline costs
b. budgeted costs.
c. estimates upon completion costs
d. scheduled costs
e. none of the above
ans: a
- 1浙江省2015年安全工程師考試報(bào)名時(shí)間為4月14日至28日
- 22015年招標(biāo)師考試招標(biāo)采購專業(yè)實(shí)務(wù)考前復(fù)習(xí)指導(dǎo)(42)
- 3PMP認(rèn)證考試練習(xí)題及參考答案(四十)
- 42015年咨詢工程師《項(xiàng)目決策分析與評(píng)價(jià)》每日一練(5.18)
- 52015年咨詢工程師《咨詢方法與實(shí)務(wù)》模擬試題(52)
- 6工藝管道、吹掃、清洗施工方案
- 72015安全工程師《相關(guān)法律知識(shí)》:煙花爆竹燃放規(guī)定
- 8如何從攪拌車方向盤上辨故障?
- 9一級(jí)建造師建筑工程復(fù)習(xí)要點(diǎn):工程質(zhì)量事故的處理程序
- 10電網(wǎng)建設(shè)再投22億 相關(guān)產(chǎn)業(yè)將受益
- 112015年咨詢工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》每日一練(3.19)
- 12金溫鐵路擴(kuò)能改造工程:青田段已完成總工程量88%
- 13地下建筑頂層加固立塔施工新技術(shù)
- 142015年監(jiān)理工程師《建設(shè)工程合同管理》練習(xí)題(25)
- 15園路工程課件 園路鋪裝
- 162015造價(jià)員《土建工程》基礎(chǔ)知識(shí)點(diǎn):建設(shè)單位管理費(fèi)
- 172015年一級(jí)建造師《項(xiàng)目管理》精華知識(shí)點(diǎn)(18)
- 182015年招標(biāo)師考試:招標(biāo)項(xiàng)目計(jì)劃管理應(yīng)具備什么條件?
- 19在代理型CM模式下,CM合同價(jià)格為什么
- 20拖管工藝
- 21豎向承載力與沉降有哪些群樁效應(yīng)?
- 22平度市2015年造價(jià)工程師考試報(bào)名時(shí)間為5月19日至6月2日
- 23[寧夏]06年造價(jià)師考試6.12-23日補(bǔ)報(bào)名
- 24造價(jià)工程師案例分析復(fù)習(xí)要點(diǎn):調(diào)整所得稅計(jì)算基數(shù)問題
- 25招標(biāo)師考試《案例分析》考前提高試題匯總
- 26高鐵綠化工程施工技術(shù)交底10p
- 27濟(jì)南市2015年安全工程師考試報(bào)名時(shí)間為6月下旬至7月上旬
- 282012一級(jí)建造師《公路工程》:現(xiàn)場(chǎng)材料管理的作用
- 292015造價(jià)員《土建工程》知識(shí)點(diǎn):溶劑型合成樹脂涂料
- 30注冊(cè)咨詢工程師2015年《項(xiàng)目決策分析》習(xí)題(14)
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓