1. Communications is best described as:A. an exchange of information.
B. providing written or oral directions.
C. consists of senders and receivers
D. effective listening.
E. All of the above
ANS: E
2. Fixed Price contracts place more risk on the:
A. owner
B. buyer
C. seller
D. contractor
E. C or D
ANS: E
3. Life cycle costing is the total cost to the customer for the acquisition and
ownership over its full life. Life cycle costing categories include the cost
of _____, _____, and _____.
A. R & D, maintainability, operation and support.
B. R & D, production, operation and support.
C. Acquisition, operations, maintenance.
D. Production, operations, maintenance.
E. None of the above
ANS: B
4. Management By Objectives assumes that the team:
A. is receptive to an unstructured environment.
B. does not require close supervision.
C. possesses a self directed philosophy
D. identifies with project objectives.
E. All of the above.
ANS: E
5. Quality may be defined as:
A. conformance to requirements.
B. fitness for use.
C. continuous improvement of products and services
D. appeal to the customer
E. All of the above except B
ANS: E
6. Since risk is associated with most projects, the best course of action is
to:
A. cover all project risks by buying appropriate insurance
B. ignore the risks, since nothing can be done about them and move forward with
the project in an expeditious manner.
C. avoid projects with clear and present risks
D. eliminate all known risks prior to the execution phase of the project
E. identify various risks and implement actions to mitigate their potential
impact
ANS: E
7. The process of choosing/documenting the best approach to achieve the project
objectives is part of:
A. The scope baseline.
B. Scope authorization
C. Scope definition
D. Scope planning.
E. All of the above.
ANS: D
8. Time management is the allocation of time in a project’s life cycle through
the process of:
A. Planning
B. Estimating.
C. Scheduling.
D. Controlling
E. All of the above.
ANS: E
9. A comprehensive definition of scope management would be:
A. Managing a project in terms of its objective through the concept,
development, implementation, and termination phases of a project.
B. Approval of the scope baseline.
C. Approval of the detailed project charter.
D. Configuration control.
E. Approved detailed planning including budgets, resource allocation, linear
responsibility charts and management sponsorship.
ANS: A
10. Cost Plus Percentage of Cost contracts are more desirable for the:
A. owner
B. buyer
C. seller
D. contractor
E. C or D
ANS: E
- 1如何推進(jìn)項(xiàng)目管理信息化
- 2河流有哪些下蝕作用?
- 32015年監(jiān)理工程師三控選擇第41-50題
- 4立柱化學(xué)植筋加固方法
- 5海航集團(tuán)利用統(tǒng)一門戶技術(shù)實(shí)現(xiàn)綜合信息管理
- 62015咨詢工程師考試《咨詢概論》預(yù)測(cè)試題(10)
- 72015年咨詢工程師《工程咨詢概論》每日一練(12.26)
- 8范圍管理:公路橋梁引道不均勻沉陷防治措施的初探
- 9啟動(dòng)2009年度招標(biāo)師再登記工作通知
- 102015年造價(jià)工程師《理論與法規(guī)》教材講解(5)
- 11鐵路隧道施工組織設(shè)計(jì)范文(實(shí)施)
- 122015年咨詢工程師《工程咨詢概論》每日一練(4.5)
- 13招標(biāo)師考試《招標(biāo)采購(gòu)案例分析》資料(4)
- 142015年二級(jí)建造師《施工管理》每日一練(11.07)
- 15施工項(xiàng)目管理部 內(nèi)容
- 16特殊人員是包含在特種作業(yè)人員里的嗎
- 17北京某框剪教學(xué)樓防水工程施工方案
- 18《政策與發(fā)展規(guī)劃》知識(shí)點(diǎn):政策性銀行
- 19裸露爆破法安全技術(shù)
- 202015年監(jiān)理工程師《建設(shè)工程合同管理》練習(xí)題(19)
- 21廚房衛(wèi)生間地面聚合物水泥防水涂料施工工藝
- 22造價(jià)工程師復(fù)習(xí)資料:概算指標(biāo)的作用
- 232013年西藏二級(jí)建造師初始注冊(cè)申請(qǐng)表
- 24二級(jí)建造師《法規(guī)》考點(diǎn)狂背:施工安全生產(chǎn)許可證制
- 25自來(lái)水廠及管道施工組織設(shè)計(jì)204P
- 26監(jiān)理工程師考試2015《建設(shè)工程合同管理》練習(xí)題(8)
- 272015年招標(biāo)師考試:招標(biāo)實(shí)務(wù)問(wèn)答(84)
- 28軟件項(xiàng)目管理與一般項(xiàng)目管理的區(qū)別是什么?
- 29【經(jīng)驗(yàn)之談】二級(jí)建造師行業(yè)的前景及待遇怎么樣?
- 302015年咨詢工程師《宏觀經(jīng)濟(jì)政策與發(fā)展規(guī)劃》每日一練(8.19)
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓