監(jiān)理公司管理系統(tǒng) | 工程企業(yè)管理系統(tǒng) | OA系統(tǒng) | ERP系統(tǒng) | 造價(jià)咨詢管理系統(tǒng) | 工程設(shè)計(jì)管理系統(tǒng) | 甲方項(xiàng)目管理系統(tǒng) | 簽約案例 | 客戶案例 | 在線試用
X 關(guān)閉
軟件項(xiàng)目管理工具

當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具

2010年P(guān)MP美國項(xiàng)目管理考試習(xí)題及答案六十七

申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114

QUEST The Risk of NOT meeting project quality objectives: 
A can be minimized through continuous monitoring. 
B considered a long term risk. 
C will be reflected in the "in-service" life of the product or service. 
D B and C 
E All of the above. 
參考答案:E

QUEST The "zero defect" concept was proposed by: 
A Deming 
B Juran 
C Crosby 
D Tagushi 
E A and D only 
參考答案:C

QUEST The use of quality circles: 
A has proven ineffective in both Japan and the U.S. 
B is particularly effective in overcoming labor/management conflicts. 
C provides a quick fix for most quality problems. 
D allows workers the opportunity to generate solutions for chronic quality problems. 
E A and B only 
參考答案:D

QUEST In a flowchart, the diamond form is used to represent: 
A a starting point. 
B an operation. 
C a written report. 
D a decision point. 
E an end point. 
參考答案:D

QUEST In a  fishbone diagram, the effect you are concerned about is placed: 
A at the right-hand end of the spine. 
B at the end of the diagonal line (i.e. "fin"). 
C on a branch of a fin. 
D at the left-hand end of the spine. 
E None of the above. 
參考答案:A

相關(guān)試題:

2010年P(guān)MP美國項(xiàng)目管理考試習(xí)題及答案六十六

試題推薦:

2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選1

2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選2

2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選3

發(fā)布:2007-03-02 10:53    編輯:泛普軟件 · xiaona    [打印此頁]    [關(guān)閉]
相關(guān)文章:

泛普軟件項(xiàng)目管理工具其他應(yīng)用

項(xiàng)目管理工具 禪道項(xiàng)目管理軟件 夢(mèng)龍項(xiàng)目管理軟件 微軟項(xiàng)目管理軟件 裝飾管理系統(tǒng) 裝修預(yù)算軟件 項(xiàng)目計(jì)劃軟件 項(xiàng)目進(jìn)度管理軟件 軟件項(xiàng)目管理工具 材料管理軟件 工程項(xiàng)目管理軟件系統(tǒng) 項(xiàng)目管理系統(tǒng) 施工管理軟件 建筑工程項(xiàng)目管理軟件 工程管理軟件