PMP認(rèn)證考試練習(xí)題及參考答案(二十二)
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
1. project life cycles provide a better means of measurement of progress and control. the four phases of a project are conceptual development,
_____, _____, and _____.
a. preliminary planning, detail planning, closeout
b. implementation, reporting, termination
c. development, implementation, termination
d. execution, reporting, finishing
e. implementation, termination, post-audit review
ans: c
2. response planning is the responsibility of the functional areas and considers
a. mitigation.
b. deflection.
c. contingency planning.
d. unforeseen occurrences.
e. all of the above.
ans: ehttp://ks.examda.com
3. the definitive terms of a contract are written during which of the following contract phases?
a. contract phase
b. post-award phase
c. award phase
d. pre-award phase
e. requirement phase
ans: c
4. the sending or conveying of information from one place to another is the process of
a. networking
b. transmitting
c. interacting
d. promoting
e. interfacing
ans: b
5. which of the following types of cost are relevant to making financial decisions:
a. sunk cost
b. opportunity cost
c. material cost
d. a and c onlywww.Examda.CoM
e. b and c only
ans: e
6. in preparing a good project definition, experienced project managers will:
a. concentrate mainly on the end product rather than costs or benefits. these come later.
b. realize that only the "tip of the iceberg" may be showing. as a project manager, you must get beneath it.
c. understand that a project definition/plan is a dynamic rather than static tool, and thus subject to change.
d. try to convert objectives into quantifiable terms.
e. all of the above
ans: e
7. in which of the following is the cost of risk hidden by the contractor?
a. firm fixed price contract
b. fixed price plus incentive
c. cost plus fixed price
d. cost plus percentage of cost
e. a and b
ans: d來(lái)源:考試大網(wǎng)
8. management of a certain building was receiving complaints about slow elevator service. the solution adopted was to add mirrors in the
lobbies to reduce boredom while passengers waited. this is an example of _____ .
a. kepner-tregoe method
b. potential problem analysis
c. decision analysis
d. creative problem solving
e. none of the above
ans: d
9. pure risk differs from business risks because pure risk's _____ .
a. include chances of both profit or loss associated with the business.
b. include chances of loss and no chances for profit associated with the business.
c. must incur personal loss with business liability.
d. must incur business liability associated with loss of pure profit.
e. b and c
ans: b來(lái)源:考試大
10. the actual configuration of a pert/cpm network _____ the amount of resources that can be devoted to the project.
a. increases.
b. is not affected by
c. does not require
d. is heavily dependent upon
e. is the only means of determining
ans: d
11. the following types of costs are relevant to making a financial decision except:
a. opportunity costs
b. direct costs
c. sunk cost
d. unavoidable costs
e. none of the above
ans: c
12. the standard types of communication include all but
a. written
b. verbal
c. telepathic
d. nonverbal
e. none of the above
ans: c
13. _____ of the extra costs of the project can often be attributed to a lack of quality.
a. 0.12
b. 0.15
c. 0.2
d. 0.25
e. less than 10%
ans: c
14. a budget estimate should give the manager cost data accurate to within:
a. -5 to +10 percent of actual cost
b. -25 to +75 percent of actual cost
c. -30 to +75 percent of actual cost
d. -10 to +25 percent of actual cost考試大論壇
e. none of the above
ans: d
相關(guān)練習(xí)題:
PMP認(rèn)證考試最新練習(xí)題及參考答案匯總
精品推薦:
PMP全真試題精選
歡迎進(jìn)入在線試聽(tīng):項(xiàng)目管理網(wǎng)上輔導(dǎo),熱招中!!
更多信息請(qǐng)進(jìn)入:項(xiàng)目管理海量題庫(kù) 考試大項(xiàng)目管理論壇
- 1安全工程師安全生產(chǎn)法復(fù)習(xí)資料——檔案管理與公告
- 2二建復(fù)習(xí)資料砌筑砂漿組成材料
- 32015造價(jià)員考試基礎(chǔ)知識(shí):開(kāi)標(biāo)與評(píng)標(biāo)
- 4某污水處理廠及配套管網(wǎng)工程施工組織設(shè)計(jì) 96P
- 5湖北某車站站房項(xiàng)目生活區(qū)平面布置圖
- 6二級(jí)建造師法規(guī)知識(shí)點(diǎn):合同的變更
- 7《招標(biāo)采購(gòu)專業(yè)實(shí)務(wù)》考點(diǎn)歸納:編制工程概況
- 82015年監(jiān)理工程師考試《理論與法規(guī)》試卷及答案
- 92013年二級(jí)建造師《法規(guī)》重點(diǎn):訴訟時(shí)效
- 102015安全工程師考試考前沖刺試題精選(6)
- 112015年招標(biāo)師《招標(biāo)采購(gòu)法律法規(guī)與政策》試題(7)
- 122015咨詢工程師考試《咨詢概論》預(yù)測(cè)試題(4)
- 13某城市花園環(huán)境景觀工程施工組織設(shè)計(jì)
- 142012一級(jí)建造師《公路工程》:公路施工過(guò)程組織方法和特點(diǎn)(2)
- 152015招標(biāo)師成績(jī):法規(guī)101分、管理106分、實(shí)務(wù)78分、案例78分
- 16受巖溶影響的地基的相關(guān)處理措施
- 172015年安全工程師生產(chǎn)技術(shù)模擬練習(xí)(9)
- 182015一級(jí)建造師《機(jī)電工程》講義輔導(dǎo)(13)
- 192015年咨詢工程師《分析與評(píng)價(jià)》每日一練(4.20)
- 202015年招標(biāo)師《招標(biāo)采購(gòu)法律法規(guī)與政策》試題(17)
- 21嵌巖樁有哪些特點(diǎn)?
- 22而工程量則按實(shí)際完成的數(shù)量結(jié)算,這種合同屬于什么合同
- 232015年招標(biāo)師《招標(biāo)采購(gòu)案例分析》串講資料下載(11)
- 24一級(jí)建造師管理與實(shí)務(wù)復(fù)習(xí)要點(diǎn):液態(tài)水
- 25施工前應(yīng)采用靜載試驗(yàn)確定單樁豎向抗壓情況
- 26杭州城站火車站預(yù)計(jì)八月開(kāi)工十一亮
- 27安全工程師《法律法規(guī)》習(xí)題班講義精選(55)
- 28經(jīng)濟(jì)政策與發(fā)展規(guī)劃考點(diǎn):區(qū)域規(guī)劃的編制
- 292015年安全工程師考試《安全生產(chǎn)法》:危險(xiǎn)化學(xué)品的運(yùn)輸
- 302013年二級(jí)建造師《法規(guī)及相關(guān)知識(shí)》每日一練(11.8)
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓