1. The subdivision of major project deliverables, as identified in the scope statement, into smaller, more manageable components is called:
a. parametric estimation.
b. scope definition.
c. feasibility analysis.
d. benefit-cost analysis.
2. The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called:
a. strategic planning.
b. alternative objectives inventory.
c. management by objectives.
d. contingency planning.
3. A fundamental tenet of modern quality management holds that quality is most likely to be achieved by:
a. planning it into the project.
b. developing final inspections for quality.
c. striving to do the best job possible.
d. conducting quality circle activities.
4. The time-phased budget that will be used to measure and monitor cost performance in he project is called the:
a. work breakdown structure.
b. project schedule.
c. cost baseline.
d. cost budget.
5. At XYZ Inc., the hourly wage for semi-skilled workers is .00. The annual audit shows that fringe benefits cost 30% of basic wages, and that overhead costs are 60% of wages plus fringe benefits. What is the “l(fā)oaded” hourly wage for a semi-skilled worker at XYZ Inc.?
a. .40.
b. .60.
c. .12.
d. .33.
6. When there is uncertainty associated with one or more aspects of the project, one of the first steps to take is to:
a. revise project plan.
b. conduct a risk-benefit analysis.
c. conduct a needs analysis.
d. increase the estimated cost.
7. A narrative description of products or services to be supplied under contract is called:
a. the project plan.
b. a statement of work.
c. an exception report.
d. Pareto analysis.
8. An example of scope verification is:
a. reviewing the performance of an installed software module.
b. managing changes to the project schedule.
c. decomposing the WBS to a work package level.
d. performing a benefit/cost analysis to determine if the project should proceed.
9. All of the following are examples of a source of scope change except:
a. a variation in government regulations.
b. failure to include a required feature in the design of a telecommunication system.
c. discovering a need to engage in bottom-up cost estimating.
d. introducing technology that was not available when scope was originally defined.
- 12015年一級(jí)建造師《建設(shè)工程經(jīng)濟(jì)》考試講義(13)
- 22015年二級(jí)建造師考試輔導(dǎo):仲裁程序
- 397個(gè)城市入選國家智慧城市試點(diǎn)名單 41個(gè)項(xiàng)目被確定為專項(xiàng)試點(diǎn)
- 4舟山市連島工程指揮部采取措施打造節(jié)能型大橋
- 5水泥粉煤灰碎石樁(CFG)施工作業(yè)指導(dǎo)書
- 62009年二級(jí)建造師考試《建筑工程》考試專家解析(13)
- 7監(jiān)理工程師輔導(dǎo)資料:質(zhì)量控制點(diǎn)的設(shè)置
- 8民航局力推193個(gè)大中型項(xiàng)目建設(shè),總投資5000億
- 9閥門安裝與使用手冊(cè)
- 10肇慶人事考試網(wǎng)公布2014年一級(jí)建造師報(bào)名時(shí)間:6月18日—7月10日
- 11鋼結(jié)構(gòu)矯正和成型加工質(zhì)量控制要點(diǎn)有哪些?
- 122014年一級(jí)建造師《項(xiàng)目管理》每日一練(4.4)
- 13機(jī)電工程項(xiàng)目施工質(zhì)量控制策劃的依據(jù)
- 14中鐵十三局一公司再獲湖北省公路建設(shè)AA級(jí)信用評(píng)價(jià)
- 15專業(yè)技術(shù)人員執(zhí)業(yè)資格的共同特點(diǎn)
- 16冰城大力推進(jìn)建筑節(jié)能 每年將新建民用節(jié)能建筑600萬平方米
- 17混凝土泵送施工工藝
- 182015二級(jí)建造師水利工程復(fù)習(xí)資料:驗(yàn)線工作
- 19全球五金零售業(yè)市場(chǎng)發(fā)展?fàn)顩r調(diào)查分析
- 20美岱水庫工程混凝土施工方案
- 21河北省關(guān)于建筑施工企業(yè)安全生產(chǎn)許可證的通知
- 222015年監(jiān)理工程師《合同管理》每日一練(8.29)
- 23高層設(shè)計(jì)原理
- 24招標(biāo)師專業(yè)知識(shí)法律法規(guī)第四章歷年考題及分析(1)
- 25強(qiáng)制式攪拌機(jī)專業(yè)保養(yǎng)知識(shí)
- 26依法實(shí)行工程監(jiān)理
- 27建筑物室內(nèi)分線設(shè)備的設(shè)置規(guī)定有哪些?
- 28市政管道工程檢查井常見問題和措施有哪些?
- 29砌體結(jié)構(gòu)設(shè)計(jì)總結(jié)
- 302015年監(jiān)理工程師:施工進(jìn)度控制目標(biāo)的確定
成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓