工程項目管理系統(tǒng) | OA系統(tǒng) | ERP系統(tǒng) | 工程項目管理軟件 | 裝飾管理系統(tǒng) | 簽約案例 | 購買價格 | 在線試用 | 手機APP | 產(chǎn)品資料
X 關閉

[中英]提高路基及路面基層平整度的措施

申請免費試用、咨詢電話:400-8352-114

內(nèi)容簡介

  路基的施工質(zhì)量,是整個路線工程的關鍵,也是路基路面工程能否經(jīng)受住時間、車輛運行荷載、雨季冬季的考驗。要做好路基工程,必須扎扎實實地進行路基的填筑,尤其對原地面的處理和坡面基地的處理?! ÷返烫盍弦话銘捎蒙暗[及塑性指數(shù)和含水量符合規(guī)范的土,不使用淤泥、沼澤土、凍土、有機土、含草皮土、生活垃圾及含腐殖質(zhì)的土。對于液限大于50,塑性指數(shù)大于26 的土,一般不宜作為路基填土,但在安藺段,由于費用和當?shù)赝临|(zhì)的原因,受工程作業(yè)現(xiàn)場條件限制,必須使用?! he roadbed construction quality, the whole line is the key, but also the road embankment project can be withstood time, vehicle running load, the test of the winter rainy season. Roadbed project to do, we must earnestly carry out the roadbed filling, in particular, the original ground handling and processing base of the slope.  General embankment fill gravel and plastic should be used for compliance and the soil moisture content, the non-use of mud, swamp soil, frozen soil, organic soil, soil with grass, garbage and the soil with humus. For more than 50 liquid, plastic index greater than 26 territories, the general should not be as roadbed fill, but in the rush, the local soil and because of the cost of reasons, the works site constraints, must be used.  

專題推薦

  • · 路面基層平整度記錄表
  • · 路面基層施工組織設計
  • · 路面基層

培訓課程

  • · 施工技能課程五折,機不可失
  • · 【預售】施工前期必備技能
  • · 道路路基施工必備知識
  • · 市政施工基礎入門培訓
  • · 施工識圖讀圖,這些要掌握!
發(fā)布:2007-11-30 15:46    編輯:泛普軟件 · xiaona    [打印此頁]    [關閉]
相關文章:

泛普材料管理軟件其他應用

項目管理工具 禪道項目管理軟件 夢龍項目管理軟件 微軟項目管理軟件 裝飾管理系統(tǒng) 裝修預算軟件 項目計劃軟件 項目進度管理軟件 軟件項目管理工具 材料管理軟件 工程項目管理軟件系統(tǒng) 項目管理系統(tǒng) 施工管理軟件 建筑工程項目管理軟件 工程管理軟件